Analysis and evaluation of some selected HVAC systems for an altered existing building.
Talk To Us

aku.sefamorakoena@morksreidglo bal.com
ENERGY MODELLING:NABERSNZ
The project refers to the alterations to an existing office building located at New Plymouth-New Zealand. The building has eight floors, six of which are used for office space and a plant room with services on the levels above. The building was aiming for a NABERSNZ rating and was thus investigated by evaluating three distinct HVAC systems, as well as other considerations with details below:
–HVAC Option 1 – VRF
–HVAC Option 2 – 2 pipe chilled water system
–HVAC Option 3 – 4 pipe chilled water system
The results for the base building using various HVAC systems indicates that, the VRF corresponds to an energy use intensity of 135 kW/m2/yr, whereas a two-pipe chilled water system corresponds to 89 kWh/m2/yr. The average of the four pipe chilled water systems is also 80 kWh/m2/year.
Moreso, the results showed that VRF option will result in higher carbon emissions than the 4-pipe and 2-pipe chilled water systems, respectively.
From the modelling results obtained, the 2-pipe chiller system was recommended as the optimal HVAC system for the project based on cost, ease of installation and the corresponding NABERSNZ rating.



ADDRESS
- Accra: G6-065-9148, Nungua
- Abuja: B50 Sahara, Gwarinpa
- Bangalore: 499 KSY, 5th Main, 4th Cross, Dodda Basti Road.560056
- Legal Policies and terms
- MORKS Global standard Ts&Cs © 2022 MORKS Global Support Services